Engineering Notebook – 01/03/2019

Attendance:

Alex, Charles, Cameron and Drew

 

Goals:  

  • Attach the new spool to the robot
  • Finish an autonomous program to get the robot off the lander
  • Get the plexi-glass attached

Meeting Notes

  • The plexi-glass was attached by Zach and Drew
  • The spool was attached by Drew
  • The autonomous code was successful in bringing the robot off the lander
  • Zach, Drew and Cameron figured out a permanent place for the battery
  • Charles cut the foam around the Phone, so it would fit loosely instead of tightly
  • Got to driving the robot but figured the lift was much to slow

To Do:

  • The linear lift either needs to move faster or the gear ratio needs to be lessened (current ratio is 1:9)
  • The autonomous code needs to be able to lower the robot and AT LEAST be able to make it to the crater

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s