Engineering Notebook – 11/01/2018

Attendance:

Alex, Zach, Cameron and Drew

 

Goals:  

  • To attach marker dropper

Meeting Notes

  • Problems: Where to attach it?
  • Decided that it was not possible to place the dropper with its current
    configuration.
  • Had to change the C channel and pulley system.
  • After changes the c channel needed to be flipped to the bottom and a c channel needs to be put between the servo holder and the xrail

IMG_1236.jpg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s